SKK Migas and PT Medco E&P Tarakan have finished drilling the GBD-B development well in the Tarakan working area, with initial tests showing output of 500 barrels of oil per day and 4 million standard cubic feet per day of gas, above the original target.
Medco Tarakan Well Delivers 500 Barrels a Day

The result matters because Indonesia is still trying to arrest declining domestic oil output and support gas supply for power generation, especially in remote regions such as Tarakan in North Kalimantan. The well is expected to start producing in early November 2026 and adds incremental lifting at a time when every barrel counts for national supply.
SKK Migas said the well is part of efforts to optimize mature fields that have already been producing for years. The agency had targeted only 300 barrels of oil per day and 2 MMSCFD of gas, so the early flow rate gives Medco and the regulator a stronger case for extending development drilling in the area.
The well is designed to produce from two formations through a single borehole, a setup that can improve reservoir utilization and reduce development costs. Medco said the GBD-B success is being followed by drilling of GBD-A, which spudded on Nov. 8 as part of a continuing program in the Tarakan working area.
For investors, the key takeaway is that Medco is adding production from an existing asset rather than depending solely on higher-risk frontier exploration. That tends to support cash flow visibility and reinforces the value of brownfield optimization in Indonesia’s upstream sector, where new supply is increasingly harder and more expensive to find.
Oil prices have also stayed elevated by historical standards, with WTI trading near $89.56 a barrel in the latest forecast snapshot, which improves the economics of incremental upstream output. Any sustained production ramp from Tarakan would be positive for Medco’s upstream portfolio and for Indonesia’s efforts to shore up fuel and gas availability heading into year-end.
| Entity | Gains | Losses |
|---|---|---|
| Medco E&P Tarakan | ▲Higher output, stronger cash flow | ▼Drilling and operating costs |
| SKK Migas | ▲More national lifting, supply stability | ▼Pressure to keep mature fields productive |
| Tarakan power users | ▲More reliable gas supply | ▼Dependence on continued field performance |
| Competing oil importers | ▲None directly | ▼Lower urgency if domestic supply improves |

